Small Cell & 5G

KMB has provided small cell design consultation on over 18,000 small cell projects nationwide. We are able to mobilize to any site location within 24-72 hours’ notice for field surveys. Gathered field data transfers into our pole/foundation analysis software which allows for the accurate and smooth generation of construction drawings.

KMB has developed an in-house team covering site acquisition, design, structural, traffic engineering, permitting and custom design services for small cell deployment to meet the varying requirements of each municipality. In our experience, the design and engineering requirements can vary considerably from jurisdiction to jurisdiction. A lack of appreciation and understanding of these requirements can cause drastic permitting delays and failure to meet deployment metrics.